TranSystems
 

Maria Cino

  Maria Cino
  Maria has more than two decades of experience in senior level positions in the
  executive and legislative branches of government, as well as the private sector. She
  was President and Chief Executive Officer of the 2008 Republican National  
  Convention held in Minneapolis-St. Paul. Her government service includes
  Deputy Secretary of the United States Department of Transportation (from May 2005 
  through March 2007). During that time she also served as the Acting Secretary of 
  Transportation. Maria also served as Assistant Secretary and Director General of the
  United States and Foreign Commercial Service at the US Department of Commerce.
Click here to learn more information about TranSystems

In The News

The 12th Edition of the "Rules of Thumb" booklet is hot off the presses and available on-line at www.transystems.com/rules. This resource contains costing information for nearly everything that goes inside a distribution center/warehouse facility (material handling, storage, technology, lighting, etc.).


click to read

(GLOBE NEWSWIRE) -- Gilbane Building Company, a leading construction management firm, announced today that it has been selected to provide Design Build/Construction Management services for a $100 million, 315,000 square foot manufacturing and bottling facility for Ocean Spray Cranberries, Inc., in Lehigh County, PA. Gilbane is partnered with TranSystems and Javlyn Engineering in this effort.

 


click to read
In the business of port operations, there is always room for a better matching of big picture strategy with operational tactics: “not every port will be a super-hub", points out Rick Ferrin, vice president at consultant TranSystems, in its Jacksonville office.

click to read

Metra, the lead agency for the design and construction, engaged TranSystems to provide design engineering services for CREATE project P1, known as the Englewood Flyover, to eliminate the at-grade crossing.


click to read
The award-winning design for the National Oceanic and Atmospheric Administration’s (NOAA) new Southwest Fisheries Science Center (SWFSC) replacement laboratory saw its first sign of movement on Sept 15 with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act (ARRA), resulting in a rapidly advanced construction plan for the facility.


click to read

In February, New Millennium Wind Energy will begin work on its 50,000-square-foot facility to manufacture a vertical-axis wind turbine, designed and built by Dondlinger Construction and TranSystems.


click to read
Great Rivers Greenway and the city of St. Louis will have an open house on Thursday, Sept. 29, to share preliminary design plans for the Carondelet Connector, a planned .75-mile trail that will connect Carondelet Park with the River des Peres Greenway.
click to read
The AREMA Annual Conference at Railway Interchange 2011 will host the AREMA Functional Group Technical Sessions on Tuesday, September 20, including Engineering Services presentations.

click to read
They cost $11 million and were designed by an architect whose specialty is comfortable microclimates.

click to read