TranSystems
 

US 75 at Plano Road/DART Overpass

Texas DOT - Dallas District, Plano, Texas

TxDOT retained TranSystems to provide design services for improving capacity and traffic flow at the convergence of US 75, Plano Parkway and the Dallas Rapid Area Transit (DART) route. The project reconstructed entrance ramps at US 75, widened Plano Road, and provided new, cost-effective overpasses for DART rail traffic and vehicular traffic on Plano Road.  TranSystems’ scope of work included site investigations, retaining wall design, bridge design, vertical and horizontal layouts, hydrology and hydraulics, traffic control, signalization, landscaping, project management, plan preparation and cost estimating.
For more information about States and Municipalities contact
Market Sector Leader
TranSystems provided final engineering design services for this new, six-lane limited access parkway. The project parallels the Intercoastal MORE
The design for this interchange was an elegant solution for minimizing impacts on its site in a forest preserve. Two three-level flyover bridges MORE
This project involves the widening and reconstruction of seven miles of I-75 in Cincinnati, OH, including the reconfiguration of six interchanges. MORE
Two of the key thoroughfares in Jacksonville, FL – Interstates 95 and 10 – intersect on the southwest corner of the City's downtown. As MORE
I-35 in Johnson County, KS, serves nearly 170,000 vehicles per day, including many rush hour commuters. An influx of new businesses MORE
TxDOT retained TranSystems to provide design services for improving capacity and traffic flow at the convergence of US 75, Plano Parkway MORE
For this project, TranSystems provided management and topographical/ROW surveys in addition to engineering design. The improvements MORE
Traffic on I-95 between Glades Road and Linton Boulevard in Palm Beach County, FL is often congested. TranSystems' PD&E thoroughly MORE
The Ohio DOT's goal for this project was to improve safety and reduce congestion along this vital and heavily traveled portion of the I-77 MORE
TranSystems provided design and construction services for reconstruction of 10.34 km of US-69, through the Marais de Cygnes Wildlife MORE

Resource Center

FRA Bridge Safety Standards
More

Use of BIM Earned TranSystems a 2012 AIA Technology Award
More

May 15 2012
More

May 17 2012
More

TranSystems' Projects Recognized by the APWA
More

12th Edition Rules of Thumb Released
More