Anderson Bridge Track Rehabilitation

Massachusetts Bay Transportation Authority, Boston, Massachusetts

This engineering study determined design alternatives the MBTA's rehabilitation of the direct rail fixation system for the Savin Hill Flyover and Anderson Bridge on the South Shore Red Line Extension. The problem centered around the degradation of the concrete plinth holding the direct rail fixation system. Because of the extent and nature of the problem, repairs would not work. The project team developed a method of construction utilizing panellized temporary bridging, allowing the contractor to work on the bridge on weekends and MBTA to maintain normal operations during the week. The design solution included track and a new egg-type direct rail fixation system.
For more information about Transit and Passenger Rail contact
Market Sector Leader
Eight recently completed  security-related projects by TranSystems attacked a wide range of access and security system issues, MORE
As part of SEPTA’s Frankford Elevated Reconstruction Project, TranSystems prepared designs for the reconstruction and partial rehabilitation MORE
This engineering study determined design alternatives the MBTA's rehabilitation of the direct rail fixation system for the Savin Hill MORE
Constructing the first new station in nearly 15 years on a century-old elevated structure presents numerous space planning and MORE
Amtrak is committed to providing train stations that are safe, in good repair, and compliant with all laws and regulations. TranSystems MORE