Expressway Viaduct Rehabilitation

City of Chicago, Illinois

Every day over 300,000 vehicles use the Kennedy and Dan Ryan Expressways, the busiest in Illinois. The viaducts that span these routes through the heart of Chicago are vital to the city’s infrastructure. When IDOT designed a program to address structural deficiencies, TranSystems became the key to efficient management and administration of the 22 individual bridge projects, let and supervised by CDOT. For this viaduct with an extremely deteriorated bridge deck and load-deficient steel beams, TranSystems supervised replacement of the bridge deck, parapet walls, sidewalks, railings and bearings.
For more information about States and Municipalities contact
Market Sector Leader
Every day over 300,000 vehicles use the Kennedy and Dan Ryan Expressways, the busiest in Illinois. The viaducts that span these routes MORE
Transystems and T.Y. Lin International are providing total design services for the Seismic Analysis and Retrofit Design of the Queensboro MORE
TranSystems designed a new, "signature" bascule bridge over the Intercoastal Waterway in Palm Beach, FL. The bridge is 355 ft long MORE
Lindbergh Viaduct, built in 1927, is composed of thirteen, open spandrel arch spans, bending on a horizontal curve and supported by MORE
This new steel arch bridge was erected 150’ downstream from the historic Navajo Bridge, making it a politically and environmentally MORE
The Paseo Bridge, regarded by many as the stateliest of Kansas City’s bridges over the Missouri River, was originally constructed in the MORE
TranSystems developed contract documents for the rehabilitation of the main tower piers of the historic, 2,048-ft, two-lane Deer Isle-Sedgwick MORE
The 318 ft-long West Broadway Bridge, a vital crossing of the Passaic River at Paterson, NJ, is a three-span, concrete-steel reinforced MORE
Built in 1897, the 1,250 ft-long Strawberry Mansion Bridge over the Schuylkill River consists of four river spans and three approach spans MORE
A Location Study Report, Environmental Impact Statement, and R/W Plans revealed that the bridge required replacement. Scope of work MORE