TranSystems
 

Trail Planning for Phased Implementation

DuPage County, Illinois

TranSystems' feasibility study for the East Branch DuPage River Greenway Trail identified a strategy for the implementation of a 31-mile rail through DuPage County, IL.  A combination of off-street trails, on-street bicycle routes, and existing bikeways, the proposed trail will connect 18 schools and universities, 29 parks, 10 forest preserves, and 12 other points of interest including golf courses and sports facilities.  The trail will also connect to four other regional trails. The study identified 31 segments that can be implemented as funding becomes available. Several of them are now under construction.
For more information about States and Municipalities contact
Market Sector Leader
TranSystems was the prime consultant for design of a 2-span steel-tube-truss pedestrian bridge. Contract plans and construction services MORE
TranSystems performed a feasibility study for the entire, 9-mile DuPage River Trail and has designed three of the five segments. The Trail MORE
The Grasshopper Pedestrian Bridge, located in Moon Valley Park, replaces an at-grade crossing of a large wash that runs through MORE
TranSystems developed the project report and contract documents and provided construction supervision for the three-quarter mile bituminous MORE
TranSystems provided master planning for 3.5 miles of multi-use trail across relatively undeveloped areas of south Kansas City, and final  MORE
TranSystems served as the lead consultant in developing a comprehensive Citywide Trails Plan for Kansas City, MO. The plan accomplished MORE
Levees have become a popular location for trails, turning blank barriers into elevated promenades with scenic river views (deferring, of MORE
The landmarked High Bridge was originally built between 1839-1848 to carry the first water main into New York from the Croton Aqueduct. MORE
TranSystems performed a feasibility study and provided design services to link the north and south sections of the pedestrian / bike paths in MORE
TranSystems' feasibility study for the East Branch DuPage River Greenway Trail identified a strategy for the implementation of a 31-mile MORE

Resource Center

May 1 2012
More

May 3 2012
More

May 8 2012
More

May 10 2012
More

May 15 2012
More

May 17 2012
More