TranSystems
 

Indian Creek and Blue River Trails

City of Kansas City, Missouri

TranSystems provided master planning for 3.5 miles of multi-use trail across relatively undeveloped areas of south Kansas City, and final  design and construction plans for two segments. TranSystems' used the City’s GIS to sketch the path of the trails, following by in-the-field trail blazing.  The trails incorporate bridges over the Blue River and Indian Creek and crossings under City streets and the Union Pacific Railroad (UPRR); multiple safety measures were designed to meet the UPRR’s requirements. Effective communication with the UPRR and numerous city, state and federal agencies were the keys to success.
For more information about States and Municipalities contact
Market Sector Leader
TranSystems was the prime consultant for design of a 2-span steel-tube-truss pedestrian bridge. Contract plans and construction services MORE
TranSystems performed a feasibility study for the entire, 9-mile DuPage River Trail and has designed three of the five segments. The Trail MORE
The Grasshopper Pedestrian Bridge, located in Moon Valley Park, replaces an at-grade crossing of a large wash that runs through MORE
TranSystems developed the project report and contract documents and provided construction supervision for the three-quarter mile bituminous MORE
TranSystems provided master planning for 3.5 miles of multi-use trail across relatively undeveloped areas of south Kansas City, and final  MORE
TranSystems served as the lead consultant in developing a comprehensive Citywide Trails Plan for Kansas City, MO. The plan accomplished MORE
Levees have become a popular location for trails, turning blank barriers into elevated promenades with scenic river views (deferring, of MORE
The landmarked High Bridge was originally built between 1839-1848 to carry the first water main into New York from the Croton Aqueduct. MORE
TranSystems performed a feasibility study and provided design services to link the north and south sections of the pedestrian / bike paths in MORE
TranSystems' feasibility study for the East Branch DuPage River Greenway Trail identified a strategy for the implementation of a 31-mile MORE

Resource Center

May 1 2012
More

May 3 2012
More

May 8 2012
More

May 10 2012
More

May 15 2012
More

May 17 2012
More