Bicycle and Pedestrian Bridge Design

City of Phoenix, Arizona

TranSystems was the prime consultant for design of a 2-span steel-tube-truss pedestrian bridge. Contract plans and construction services were also provided for the project. Design of the 250-ft-long, 12-ft-10-in.-wide structure was driven by an artist's concept for truss shape; the complication of a misplaced pier was turned into an aesthetic advantage by "bending" the bridge at the center. Curved, cantilevered oval ramps of structural steel on steel columns transition to concrete ramps on grade, meeting ADA requirements while minimizing right-of-way.

*Winner of the 2006 ACEC of Arizona Grand Award
For more information about States and Municipalities contact
Market Sector Leader
TranSystems was the prime consultant for design of a 2-span steel-tube-truss pedestrian bridge. Contract plans and construction services MORE
TranSystems performed a feasibility study for the entire, 9-mile DuPage River Trail and has designed three of the five segments. The Trail MORE
The Grasshopper Pedestrian Bridge, located in Moon Valley Park, replaces an at-grade crossing of a large wash that runs through MORE
TranSystems developed the project report and contract documents and provided construction supervision for the three-quarter mile bituminous MORE
TranSystems provided master planning for 3.5 miles of multi-use trail across relatively undeveloped areas of south Kansas City, and final  MORE
TranSystems served as the lead consultant in developing a comprehensive Citywide Trails Plan for Kansas City, MO. The plan accomplished MORE
Levees have become a popular location for trails, turning blank barriers into elevated promenades with scenic river views (deferring, of MORE
The landmarked High Bridge was originally built between 1839-1848 to carry the first water main into New York from the Croton Aqueduct. MORE
TranSystems performed a feasibility study and provided design services to link the north and south sections of the pedestrian / bike paths in MORE
TranSystems' feasibility study for the East Branch DuPage River Greenway Trail identified a strategy for the implementation of a 31-mile MORE