TranSystems
 

W. Mike Lackey

  W. Mike Lackey
  Mike was elected to the Board of Directors in 2004 as an outside Director. He
  began his career with the Kansas Highway Commission. At the Kansas Department
  of Transportation, he has served as District Engineer; Bureau Chief of Construction
  and Management; Division Director of Operations; and Assistant Secretary and State
  Transportation Engineer. He has served on numerous transportation committees and
  boards, and he has received national recognition for work in the field.
Click here to learn more information about TranSystems

In The News

The 12th Edition of the "Rules of Thumb" booklet is hot off the presses and available on-line at www.transystems.com/rules. This resource contains costing information for nearly everything that goes inside a distribution center/warehouse facility (material handling, storage, technology, lighting, etc.).


click to read

(GLOBE NEWSWIRE) -- Gilbane Building Company, a leading construction management firm, announced today that it has been selected to provide Design Build/Construction Management services for a $100 million, 315,000 square foot manufacturing and bottling facility for Ocean Spray Cranberries, Inc., in Lehigh County, PA. Gilbane is partnered with TranSystems and Javlyn Engineering in this effort.

 


click to read
In the business of port operations, there is always room for a better matching of big picture strategy with operational tactics: “not every port will be a super-hub", points out Rick Ferrin, vice president at consultant TranSystems, in its Jacksonville office.

click to read

Metra, the lead agency for the design and construction, engaged TranSystems to provide design engineering services for CREATE project P1, known as the Englewood Flyover, to eliminate the at-grade crossing.


click to read
The award-winning design for the National Oceanic and Atmospheric Administration’s (NOAA) new Southwest Fisheries Science Center (SWFSC) replacement laboratory saw its first sign of movement on Sept 15 with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act (ARRA), resulting in a rapidly advanced construction plan for the facility.


click to read

In February, New Millennium Wind Energy will begin work on its 50,000-square-foot facility to manufacture a vertical-axis wind turbine, designed and built by Dondlinger Construction and TranSystems.


click to read
Great Rivers Greenway and the city of St. Louis will have an open house on Thursday, Sept. 29, to share preliminary design plans for the Carondelet Connector, a planned .75-mile trail that will connect Carondelet Park with the River des Peres Greenway.
click to read
The AREMA Annual Conference at Railway Interchange 2011 will host the AREMA Functional Group Technical Sessions on Tuesday, September 20, including Engineering Services presentations.

click to read
They cost $11 million and were designed by an architect whose specialty is comfortable microclimates.

click to read